Follow us
CN EN PT

APPLICATIONS

HOME > APPLICATIONS > Mining Industry

Mining Industry

The mining industry is usually far away from the national power grid, and they require reliable power sources to operate continuously for long-term. Mining requires uninterrupted power. The interruption of the power supply will not only affect the output of the mine, but also endanger the safety of the mine and personnel. Therefore, for important electrical equipment in mining, a dual-loop or loop-type power supply mode with two independent power supplies is required. The two power generator systems are the backup for each other. When one fails or is powered off for maintenance, another will be used as the continuous power supply to ensure the reliability of the power supply.


| Solution |

EvoTec has a wealth of long-term continuous operation experience in the industrial and mining industries. EvoTec generators have the advantages of low temperature rise, good generator parallel operation performance, high power generation efficiency, good dynamic performance, low waveform distortion rate, and good matching with various power systems etc.


| Industry Characteristics |

During the continuous operation of the generator, the continuous sudden impact loads and continuous energy-saving operation need to be considered.


| Product Requirements |

The generator has stronger shock resistance and higher efficiency in long-term continuous operation.


| EvoTec Advantages |

The anti-impact protection technology structure of EvoTec generators at notch of stator, lower temperature rise, better performance in parallel and grid-connected operation, higher power generation efficiency, better dynamic performance, good matching with various power systems and etc. enable the performance indicators of EvoTec generators are better than national standards and reach the international advanced level.

Case
TCU468C 1520KW 400V EvoTec generator+Baudouin engine for factory project

TCU468C 1520KW 400V EvoTec generator+Baudouin engine for factory project

1000kw 10.5kv EvoTec high voltage generator for Shangdong pharmaceutical factory project

1000kw 10.5kv EvoTec high voltage generator for Shangdong pharmaceutical factory project

1800kw 10.5kv EvoTec high voltage generator for treatment project

1800kw 10.5kv EvoTec high voltage generator for treatment project

EvoTec 1200kw/10.5kv High-Voltage Generator applied to Shenyang Mine Project

EvoTec 1200kw/10.5kv High-Voltage Generator applied to Shenyang Mine Project

EvoTec 1200kw/10.5kv High-Voltage Generator applied to Shenyang Mine Project

EvoTec 1200kw/10.5kv High-Voltage Generator applied to Shenyang Mine Project

EvoTec 1500kw/10.5kv/6 pole High-Voltage Generator applied to Guizhou Coal Mine Project

EvoTec 1500kw/10.5kv/6 pole High-Voltage Generator applied to Guizhou Coal Mine Project

3 units 2000kw/10.5kv EvoTec High-Voltage Generators equipped with Yuchai engine applied to Heilongjiang Chemical Plant Project

3 units 2000kw/10.5kv EvoTec High-Voltage Generators equipped with Yuchai engine applied to Heilongjiang Chemical Plant Project

EvoTec 1800kw/10.5kv High-Voltage Generator applied to Shanxi Coal Mine Project

EvoTec 1800kw/10.5kv High-Voltage Generator applied to Shanxi Coal Mine Project

4 units 1550kw/10.5kv/6 pole EvoTec High-Voltage Generator applied to Panzhou Hongdavas Power Station Project in Guizhou Province

4 units 1550kw/10.5kv/6 pole EvoTec High-Voltage Generator applied to Panzhou Hongdavas Power Station Project in Guizhou Province

EvoTec 1200kw/10.5kv High-Voltage Generator applied to Mine Project

EvoTec 1200kw/10.5kv High-Voltage Generator applied to Mine Project

德科1200KW 10.5KV沈阳某矿山电源

德科1200KW 10.5KV沈阳某矿山电源

德科2000KW 10.5KV 贵州矿山项目

德科2000KW 10.5KV 贵州矿山项目

德科1200KW 10.5KV 矿山项目

德科1200KW 10.5KV 矿山项目

德科1200KW 10.5KV矿山项目

德科1200KW 10.5KV矿山项目

CONTACT US
+86-551-87655888
0551-87655888
info@evotecpower.com
P.C.:231500
No.9, Su He Road,
Lujiang Economic Development Zone,
Hefei City, Anhui Province
TOP