Follow us

APPLICATIONS

HOME > APPLICATIONS > Data Center

Data Center

High-voltage, high-efficiency, high-performance and high-reliability, bear large-capacity nonlinear loads


| Solution |

EvoTec has long-term and reliable operation experience in data centers. The leading power factor of EvoTec generator is stable and reliable. The ability to bear the large-capacity nonlinear loads is strong. EvoTec generators have the advantages of higher efficiency, lower temperature rise, and better performance in parallel and grid-connected operation, better dynamic performance, good matching with various power systems and etc.

 

| Industry Characteristics |

High-voltage, high-efficiency, high-performance and high-reliability, an ability to bear the large-capacity nonlinear loads

 

| Product Requirements |

High-voltage generator with reliable insulation structure, high efficiency, and strong capacity of nonlinear load

 

| EvoTec Advantages |

EvoTec uses the international leading generator electromagnetic design technology to optimize efficiency performance parameters of its products. The power generation efficiency of EvoTec generator is higher than the peers by 0.5%-1%. EvoTec generators have the advantages of higher efficiency, lower temperature rise, and better performance in parallel and grid-connected operation, better dynamic performance. The power factor of EvoTec generator can be advanced to 0.9 stable operation, which has the advantages of stronger capacity of nonlinear load and good matching with various power systems. Performance indicators of EvoTec generators are better than national standards and reach the international advanced level.

Case
Big Data Center Project in Ordos City-2 x1800KW/10.5KV HV Alternators

Big Data Center Project in Ordos City-2 x1800KW/10.5KV HV Alternators

Data Center Project of Yanan Cloud Computing -7x1800KW/10.5KV HV Alternators

Data Center Project of Yanan Cloud Computing -7x1800KW/10.5KV HV Alternators

Data Cloud Project in Hunan Province  -3×1800KW/10.5KV HV alternators

Data Cloud Project in Hunan Province -3×1800KW/10.5KV HV alternators

China Merchants Bank Financial Data Center Project (5 sets of 2200W/10.5KV high-voltage generators)

China Merchants Bank Financial Data Center Project (5 sets of 2200W/10.5KV high-voltage generators)

Qingdao Huaneng Data Center Project (3 sets of 1600KW/10.5KV high-voltage generators)

Qingdao Huaneng Data Center Project (3 sets of 1600KW/10.5KV high-voltage generators)

Yan'an Cloud Computing Data Center Project (7 sets of 1800KW/10.5KV high-voltage generators)

Yan'an Cloud Computing Data Center Project (7 sets of 1800KW/10.5KV high-voltage generators)

Guiyang computing power data center project (3 sets of 1800KW/10.5KV high-voltage generators)

Guiyang computing power data center project (3 sets of 1800KW/10.5KV high-voltage generators)

EvoTec high voltage generator

EvoTec high voltage generator

EvoTec 2000kw/10.5kv High-Voltage Generator applied to a domestic data center project

EvoTec 2000kw/10.5kv High-Voltage Generator applied to a domestic data center project

4 sets of 1800kw 10.5kv dedicated High-Voltage Generators for a new generation of the Data Center successfully delivered to a Data Center Project in Guizhou

4 sets of 1800kw 10.5kv dedicated High-Voltage Generators for a new generation of the Data Center successfully delivered to a Data Center Project in Guizhou

EvoTec 2000kw/10.5kv High-Voltage Generator applied to a Chip Project

EvoTec 2000kw/10.5kv High-Voltage Generator applied to a Chip Project

EvoTec 2000kw/10.5kv High-Voltage Generator applied to Guangxi Nanning Data Center Project

EvoTec 2000kw/10.5kv High-Voltage Generator applied to Guangxi Nanning Data Center Project

CONTACT US
info@evotecpower.com
0551-87655888
info@evotecpower.com
P.C.:231500
No.9, Su He Road,
Lujiang Economic Development Zone,
Hefei City, Anhui Province
TOP